Floodplain Studies
(mapping, basin management plans, etc.)
Special Study floodplain mapping project reports can be found on the Reports Page [contents below] 51 studies with 12 + 4 other studies since 2000 (noted in red). Note that all 55 studies were conducted by consultants, not the Flood Control Dist. personnel.
- Special Study 01 - Drainage Report for Arivaca Area Plan, Blanton & Co. 3/21/72
- Special Study 02 - Critical Watershed Management Plan Ruthrauff Road Area, Cella Barr Associates, May 13, 1983
- Special Study 03 - Flecha Caida Flood Improvement Study, Simons, Li & Associates, 1/28/86
- Special Study 04 - Tucson Mountain Basin Study, Camp Dresser & McKee, Inc., March 15, 1986
- Special Study 05 - Highlands Wash Basin Management Plan Report, A-N West, Inc., July 15, 1986 and Phase III Final Report, Camp Dresser & McKee, Inc., 1/25/90
- Special Study 06 - Riverside Terrace Basin Management Plan, Dooley-Jones & Associates, 3/13/87
- Special Study 07 - Ventana Canyon Estates, Erosion Setback Limits, Osborn, Petterson, Walbert and Associates, 2/4/88
- Special Study 08 - Millstone Manor No. 6, PCDOT&FCD, 6/20/88
- Special Study 09 - Sutherland Wash, H&H Report, PC DOT&FCD, 8/9/88
- Special Study 10 - Lee Moore Wash Watershed, PC DOT&FCD, 12/29/88
- Special Study 11 - Green Valley Drainageway No.9, CMG Drainage Engineering Inc., 1/12/89
- Special Study 12 - Valley View Wash, Flecha Caida Flood Phase 2, Simons, Li & Associates, Inc., 2/15/89 and
- Special Study 13 - Holladay Street & Forrest Avenue Watershed Study, McGovern, MacVittie Lodge & Dean, Inc., 1/22/90 and Drainage Relief Assessment for the Drexel/Westover Intersection, CMG Drainage Engineering, Inc., 11/25/91
- Special Study 14 - Southwest Basin Management Study, Anderson, Passarelli & Associates, 11/27/90
- Special Study 15 - Black Wash Drainage Analysis, Administrative Floodway, 7/00/90
- Special Study 16 - [Upper] Canada Del Oro Wash Letter of Map Revision Study, David Evans and Associates, 10/28/04
- Special Study 17 - Fortyniner's Interior Drainage Improvements, PC DOT&FCD, January 1992
- Special Study 18 - Soldier Trail Wash Floodplain Delineation, Arroyo Engineering, Inc., 6/29/94
- Special Study 19 - Tortolita Mountains Geomorphic Assessment, Arizona Geological Survey, June 1992
- Special Study 20 - Valencia Wash Basin Management Study, Alpha Engineering, 3/8/93
- Special Study 21 - Upper Carmack, South Branch, Sub-Basin Management Study, Robert L. Shand, P.E., Drainage & Flood-Control Engineering, 7/24/92
- Special Study 22 - 27 Mile Wash Flood Plain Delineation Study, Collins-Pina Consulting Engineers Inc., August 1992
- Special Study 23 - TanqueVerde Creek Management Study, Johnson-Brittain & Associates, July 30, 1993.
- Special Study 24 - Tortolita Area Basin Management Plan, Ph I, Ph IIB, Cella Barr Associates, 8/3/93
- Special Study 25 - Mt. Lemmon Culvert Study, CMG, Drainage Engineering, Inc., 11/19/93, and Final Drainage Report for Summerhaven Village Center, CMG Drainage Engineering, Inc., 9/13/05
- Special Study 26 - Southwest Basin Management Study Ph. II Part A, Volume 1 and Volume 2 Cella Barr Associates, 4/29/94
- Special Study 27 - New Tucson, Units 21, 22, 23, 24 & 27, Erosion-Hazard Setback Analysis for Unit 23, Martin-McItosh, 1/23/95. Hydrologic and Hydraulic Report for Units 22, 23 and 24, DJA Job No. 84-077.01. Hydrology Report, New Tucson, Unit 27, Environmental Engineering Consultants, 9/5/96
- Special Study 28 - Hydrology/Hydraulics Report for Demetrie Wash, McGovern, MacVittie, Lodge & Associates, Inc., 10/13/94
- Special Study 29 - San Joaquin Estates Floodplain Status Hydrology Report for San Joaquin Estates -- Improvement Plans Lots 268 thru 290, Trimble Engineering, Inc., 3/22/87 and Drainage Reports for Phases III-A, IV and V of San Joaquin Estates, CMG Drainage Engineering, Inc., 5/31/89.
- Special Study 30 - Hydrologic/Hydraulic Report for Palo Verde Ranch, ICON Consultants USA, Inc., 7/1/94
- Special Study 31 - Brawley Wash Floodplain Study, Simons, Li & Associates, Inc., 9/6/96
- Special Study 32 - New Tucson Units 26, 28, 29 & 30, ICON Consultants USA, Inc., 9/9/96 and Addendum I, ICON, 3/29/06 and Addendum II, ICON, 5/15/06
- Special Study 33 - Milagrosa Hills Wash, Calle de Samuel to Agua Caliente Confluence, Simons, Li & Associates, 3/13/98
- Special Study 34 - 49ers Country Club Lots 315 to 324, McGovern, MacVittie, Lodge & Associates, Inc., 8/15/95
- Special Study 35 - Earp Wash, DJA Engineering Corp., 3/4/99
- Special Study 36 - Camino Real Wash Letter of Map Revision, (Large File: 200 MB PDF format) Castro Engineering an JE Fuller Hydrology & Geomorphology, Inc., 2/23/2009
- Special Study 37 - Camino de Oeste Wash, Arroyo Engineering, Inc., January 1999
- Special Study 38 - Sahuarita Basin Management Study, CMG Drainage Engineering Inc., 1/5/00
- Special Study 39 - HEC-1 and FLO 2-D Models for Finger Rock Wash, CMG Drainage Engineering Inc., 10/6/00 and Lower Finger Rock Wash, CMG Drainage Engineering Inc., Revised 2/28/94
- Special Study 40 - Mission Wash Study for FEMA, McGovern, MacVittie, Lodge & Associates, unknown date
- Special Study 41 - Chaparral Heights -- annexed by Oro Valley.
- Special Study 42 - Brawley Wash Primary Flood Corridor Study, Simons, Li & Associates, 6/1/99
- Special Study 43 - Idle Hour Wash Letter of Map Revision, Simons, Lie & Associates, 3/24/95
- Special Study 44 - Central Arizona Project (CAP) Tucson Aqueduct, Bureau of Reclamation, U.S. Dept. of the Interior, Reach 3 May 1982, Reach 4 April 1984, Reach 5 June 1983
- Special Study 45 - Summerhaven Hydrologic and Hydraulic Analysis, URS, 12/30/03
- Special Study 46 - Sheet Flood Mapping for Unincorporated Pima County, PCRFCD, 8/8/07
- Special Study 47 - Silverbell Trails Estates, Delph Engineering, Inc., 10/1/03
- Special Study 48 - Hacienda Sol Wash Floodplain Analysis, PC RFCD, 3/14/08 and Floodplain Analysis for an unnamed wash at the Intersection of Hacienda del Sol Road and River Road, PC RFCD, 3/14/08
- Special Study 49 - Diamond Bell Ranch Hydrology, Psomas, 10/12/07
- Special Study 50 - Floodplain Study for Flecha Caida Ranch Estates #9, Including Portions of Flecha Caida Ranch Estates #1 and #2 and Las Lomas de Catalina, JE Fuller Hydrology & Geomorphology Inc., 4/8/08
- Special Study 51 - Floodplain Analysis for Tanuri Wash, (Large File: 136 MB PDF format), PCRFCD, 6/2/08
Other studies:
HOME